Wet Wipes Packaging Lines by WILPAC: Leak-Tight Sealing, Lid Placement Accuracy and Nonwoven Tension Control
Wet wipes fail in ways that only appear weeks after packing. The pack carries far more liquid than the wipe can hold, so any interruption of the seal path lets surfactant solution migrate along the seam and seep out in the carton. Alcohol-based formulas attack seal layers and corrode unprotected machine parts. The recloseable lid has to bond to a wet, flexible surface and stay tacky through dozens of openings. None of these problems is visible at the end of the line, which is why they have to be designed out rather than inspected in.
Nonwoven handling sets the base quality. Spunlace and airlaid webs stretch under load, and a pneumatic dancer that follows speed poorly will wrinkle the web, misalign the fold and produce packs that look full but hold less. WILPAC lines use servo-driven unwind and web guiding with closed-loop tension, so the Z-fold stack is formed at constant draw and the cut length stays within tolerance at high output. Folding, stacking and pushing are mechanically synchronised with the sealing station to avoid compressing the wetted stack.
Liquid dosing and sealing decide whether the pack survives. Dosing is volumetric per pack with feedback from load cells on the supply line, and the target is set as a ratio to web weight rather than a fixed volume. Before sealing, the seal zone is cleared by an air knife so no liquid film remains between the layers. Sealing is force-controlled with temperature profiling per film structure, and every pack passes a squeeze and vacuum leak test; rejects are diverted automatically instead of being packed and shipped.
Hygiene and continuous operation are planned together. The filling area runs under laminar airflow with stainless contact parts and quick-release covers, so a formula or substrate changeover does not require a full teardown. Lid application is verified by vision for position and gap before case packing. Line interfaces, cycle times and documentation come from one supplier, which matters when a 24-hour shift cannot afford to arbitrate between three vendors. WILPAC equipment runs continuously in more than fifty countries across Europe and the Americas, with quality first and support through remote diagnostics and local spare parts. Contact wilpac@wil-pac.com.
Previous